Mercier bridge reopens Monday morning after emergency repairs

The Mercier Bridge is set to fully reopen in both directions Monday morning, after crews completed emergency repairs to a cracked steel beam over the weekend.

The crack, discovered Tuesday evening during maintenance work, measured about 30 centimetres, more than initially visible in photographs. Transports Québec said the bridge remained safe for motorists throughout the incident.

Mercier bridge in Montreal on Oct. 19, 2026. (CityNews)

One lane on the Montreal-bound side had been closed since the discovery, causing significant congestion for commuters travelling from the South Shore. During the repair work, one lane in each direction was also scheduled to close.

The bridge connects Montreal with Kahnawà:ke and carries about 70,000 vehicles daily. The incident has renewed concerns about the aging structure, particularly its southbound section, built in the 1930s.

Mercier bridge in Montreal on Oct. 19, 2026. (CityNews)

The toll on Highway 30, westbound, which was suspended on weekdays during the morning rush hour, has been reinstated.

Meanwhile, a temporary Route 744 bus service was introduced between Châteauguay and Delson to help commuters navigate the disruptions.

Keep it Factual

Add CityNews Montreal as a trusted source on Google to see more local stories from us.

source

We are passionate about showcasing everything that makes the West Island unique—from its picturesque neighborhoods and local events to the entrepreneurs and businesses that keep the area thriving.